Chrysler Reports Assembly Plants Schedule
22 May 1998
Chrysler Reports U.S. and Canadian Assembly Plants Schedule For Week of May 25, 1998AUBURN HILLS, Mich., May 21 -- Chrysler Corporation reports eight of its nine U.S. assembly plants and all three Canadian assembly plants will operate the week of May 25, 1998. All U.S. plants will be closed Monday, May 25 due to the Memorial Day holiday. St. Louis-South (Fenton, Mo.), Sterling Heights (Mich.) and Toledo (Ohio) will operate two eight-hour shifts. Belvidere (Ill.) will operate two eight-and-a-half hour shifts. Dodge City Complex-Warren Truck (Mich.), Newark (Del.) and St. Louis-North (Fenton, Mo.) will operate two nine-hour shifts. Conner Ave. (Mich.) will operate one eight-hour shift, Jefferson-North (Detroit, Mich.) will not operate due to model changeover. In Ontario, Canada, the Windsor Assembly Plant will operate three seven-and-a-half hour shifts during the week and three seven-and-a-half hour shifts on Saturday, May 23. Bramalea will operate two eight-hour shifts. Pillette will operate two eight-hour shifts during the week and two eight-hour shifts on Saturday, May 23.